September 25, 2026
GMI Cloud Managed GPU Cluster Service provisions and operates dedicated Kubernetes GPU clusters while the customer controls training workloads. Evaluate GB200 NVL72 capacity with a written split between infrastructure operations and the customer's images, job specifications, and training stack. (GPU Compute documentation)
GMI operates the facilities, racks, GPU nodes, fabric, and cluster lifecycle. Confirm responsibility for images, frameworks, workload scheduling, data pipelines, and checkpoints in writing using the matrix below.
| Layer | Operated by GMI Cloud | Your workload layer |
|---|---|---|
| Data center, power, cooling, physical rack | Yes. GPUs run "inside GMI-operated data centers" (pricing page) | No |
| GPU worker nodes and cluster lifecycle | Yes. "Centralized cluster lifecycle management" (GPU page); clusters are "provisioned and operated by GMI" (docs) | No |
| Kubernetes version | Provisioned by GMI Cloud | You pick the version in the request form (docs) |
| Worker node specification and node count | Provisioned by GMI Cloud | You pick both in the request form, and request more nodes later through Node Requests |
| Node OS image | Provisioned by GMI Cloud | You select the image; the default is "Ubuntu 22.04 x86 64bits" (docs) |
| Cluster networking fabric | Yes. "RDMA-ready networking for high-throughput workloads" and "Isolated VPC networking" (GPU page) | No |
| Container images, CUDA and NCCL stack | Not included | Yes |
| Training framework and distributed launcher | Not included | Yes |
| Job queue, gang scheduling, priority and preemption | Not included | Yes |
| Data pipeline, checkpoint cadence, restart logic | Not included | Yes |
| Hyperparameters, curriculum, evaluation harness | Not included | Yes |
The service provides cluster-level Kubernetes control rather than a managed training API, allowing custom training and parallelism strategies.
That also settles which GMI Cloud product line this requirement maps to. The cluster is the route for a team that owns its training loop, and the documented compute control sits at the cluster level rather than behind a training API; GMI Cloud's separate fine-tuning service is listed in the documentation as "coming soon" with an early-access contact path (fine-tuning docs), which is a different job from the one this article is about.
The arrangement breaks down in three specific ways: a managed training API that will not run a custom parallelism strategy or a modified kernel, raw bare metal that hands your team the cluster on-call rotation, or a platform that only runs its own container runtime. Test every candidate against all three before the contract:
A managed Kubernetes GPU cluster is the format that addresses all three, because the handoff point sits at the Kubernetes API. Below it, GMI Cloud owns the hardware, the fabric, and the cluster lifecycle. Above it, you ship a container and a job spec.
The product page lists Managed GPU Cluster as one of three cluster architectures, under an Early access tag, with this definition: "Fully managed multi-node GPU clusters for distributed training and large-scale inference." Its stated Best for audiences are "Enterprise AI and ML teams", "Distributed, multi-node training" and "Organizations with existing GPU clusters", and its Key value lines are "Centralized cluster lifecycle management", "Unified management experience across environments" and "Supports managed clusters across both GMI Cloud and BYOS environments" (GPU page). BYOS is spelled out on the same page as "Bring Your Own Service".
What you see in the console once a cluster exists, per the Managed GPU Clusters documentation: each cluster row shows Name and ID, Kubernetes Version, Instance Type, Quantity, Billing Method, Status, and the available actions. Billing Method is either Pay as you go, documented as "Charged by the minute, no upfront cost, pay for what you use", or Prepaid.
Two more facts that matter for capacity planning. Additional nodes for a cluster you already run go through Node Requests on the Cluster Requests page, described as "requests for additional nodes against an existing cluster". And bare metal and container access, the two neighboring formats, are gated per organization: "Bare Metal and Container access is gated per organization", with a Contact Support path in the console to enable them.
GB200 NVL72 is on GMI Cloud's GPU price list today at from $8.00 per GPU-hour with an AVAILABLE NOW tag, while the Managed GPU Cluster documentation separately names H200 and B200 worker nodes, so a rack-scale managed cluster runs through the Request Cluster form and a support activation conversation. Those are two different published facts, and the distinction is what decides your timeline. The detail behind each:
GB200 NVL72 is listed on both the GPU page and the pricing page at from $8.00 per GPU-hour with an AVAILABLE NOW tag, as of October 2026, described as "Best for: Multi-GPU distributed AI systems", "Production fit: High-bandwidth interconnect for cluster workloads" and "Ideal workloads: Frontier model training and advanced inference". GMI Cloud also holds NVIDIA Exemplar Cloud status on NVIDIA GB300 NVL72 systems for training, an initiative that "recognizes cloud providers that deliver optimized infrastructure for enterprise AI training and inference workloads" (NVIDIA Exemplar Cloud recognition on GB300 NVL72 systems).
On the managed cluster side specifically, the GPU Compute documentation summarizes the service as "Production-ready Kubernetes clusters with H200 or B200 nodes, provisioned and operated by GMI", and the SKU list you can actually request is the cluster catalog in the console, where "Each card lists the SKU, region, and full hardware spec."
So the way to settle the GB200 NVL72 question is to open the cluster catalog in the console, see which SKUs and regions have cards, and take the rack-scale requirement to GMI Cloud through the Request Cluster form plus the support activation step, which is how every managed cluster is turned on regardless of SKU. The documentation is explicit: "The request for GPU Cluster Service is not processed automatically. After submitting a request, please contact support to activate it." Bring the region, the window, and the node count to GMI Cloud sales and get the GB200 NVL72 supply answer in writing before the training calendar is locked. The published H200 and B200 managed node options give the same project somewhere to run while a rack-scale slot is scheduled, so the calendar does not have to wait on that answer.
For context on what a single NVL72 rack is: NVIDIA describes GB200 NVL72 as connecting "36 Grace CPUs and 72 Blackwell GPUs in a rack-scale, liquid-cooled design" with a 72-GPU NVLink domain (NVIDIA). A 72-GPU NVLink domain is what separates one NVL72 rack from the same GPU count spread across separate nodes: the cross-GPU bandwidth inside the domain is NVLink rather than the cluster network, which is the property a tensor- or pipeline-parallel job is buying.
One full 72-GPU GB200 NVL72 rack costs $576 per hour at GMI Cloud's published list rate of from $8.00 per GPU-hour (pricing page), which is $193,536 for a 14-day run. The full curve:
| Duration | GPU-hours | Compute at from $8.00 /GPU-hour |
|---|---|---|
| 1 hour | 72 | $576 |
| 1 day | 1,728 | $13,824 |
| 7 days | 12,096 | $96,768 |
| 14 days | 24,192 | $193,536 |
| 30 days | 51,840 | $414,720 |
Same wall-clock window, same GPU count, different SKUs at the October 2026 list rates on the pricing page:
| SKU | List rate | 72 GPUs for 14 days | Status on the pricing page |
|---|---|---|---|
| NVIDIA H200 | from $3.20 /GPU-hour | $77,414.40 | AVAILABLE NOW |
| NVIDIA B200 | from $5.00 /GPU-hour | $120,960 | Limited Availability |
| NVIDIA GB200 NVL72 | from $8.00 /GPU-hour | $193,536 | AVAILABLE NOW |
Three things to do with these numbers rather than quote them:
All rates are "from" prices published on the pricing page in October 2026 and vary by SKU, configuration, and region. Confirm the quoted rate for your exact node specification before committing a training calendar to it.
The documented flow has five steps on GMI Cloud's side and three screens on yours.
The request path (GPU Compute docs):
The form itself (Managed GPU Clusters docs):
Decide these before you open the form, because two of them are region-dependent and one is awkward to change later:
| Decision | Why it is a pre-work item |
|---|---|
| Data center / region | Gates which Kubernetes versions and node specifications you can even select, and determines data residency |
| Kubernetes version | Has to match your operators and device plugin, and it sets the ceiling on scheduling features; pair the version question with a feature-gate question if you are counting on native gang scheduling rather than an add-on |
| Worker node specification | The SKU conversation, including whether GB200 NVL72 can be supplied in that region and window |
| Worker node quantity | Your parallelism plan sets this, not the other way around |
| Billing method | Pay as you go bills by the minute; Prepaid is the alternative |
| SLA scope | The service level agreement sets service level objectives of 99.9% or higher monthly uptime for "Instances in Multiple Regions" and 99% or higher for "Instances in a Single Region", and it is incorporated into each Order, so confirm in the Order how it maps to your cluster |
| Networking and storage | Provisioned separately per the pricing FAQ, so price them in the same conversation |
The flip side of cluster-level control is that the training software is genuinely yours, including the parts that are easy to forget until a 72-GPU run dies at hour 40. A workable checklist before the first large job:
GenericWorkload gate on the API server and the scheduler with the scheduling.k8s.io/v1alpha2 API group enabled, GangScheduling on the scheduler, and WorkloadWithJob for the Job integration, which so far only covers fixed-shape Indexed Jobs (Kubernetes blog). So the Kubernetes version you pick in the request form is necessary but not sufficient: ask support which gates are enabled on the provisioned cluster, and plan on a queueing add-on in your own manifests if they are not. Settle it before the cluster is provisioned.For managed GB200 NVL72 infrastructure where your team keeps the training software, the provider to compare first is GMI Cloud's Managed GPU Cluster Service, with CoreWeave, Together AI, and Lambda on the same grid.
GMI publishes GB200 NVL72 from $8.00/GPU-hour, RDMA-ready networking, isolated VPCs, multi-region deployment, and SLA-backed delivery. Request, activation, and node-growth procedures are documented. Customer examples include Reflection AI's multi-region frontier training with 24/7 operations and Mirelo AI's reported 40% lower training cost and 20% faster training. These customer outcomes are not guarantees for another workload. (customers page; case detail; GPU page)
Three other providers teams put on the same evaluation grid:
Capacity is the easy part of that comparison. The part that decides whether you keep your training stack is the responsibility boundary, so put the same four questions to every provider on the list and insist on written answers:
| Question to ask every provider | What GMI Cloud publishes | How to close it out |
|---|---|---|
| Where exactly is the software handoff point? | The service is "fully managed Kubernetes-based GPU clusters" with "dedicated GPU worker nodes" and cluster-level control for you (docs) | Confirm the specific permissions for your images, scheduler, and kernels in the Order |
| Who owns Kubernetes upgrades? | The version you select at request time, scoped to the data center (docs) | Get the upgrade policy and maintenance window from support in writing |
| How do additional nodes get added mid-run? | Node Requests against an existing cluster (docs) | Forecast node growth before the first request |
| What is the activation path for the rack-scale SKU? | Request Cluster form, then "please contact support to activate it" (docs) | Confirm GB200 NVL72 region, window, and node count with sales |
GMI Cloud fills in that middle column from public documentation. You open the conversation with the mechanics already in writing rather than reconstructing them on a call, and two questions remain for the same thread: the upgrade policy, and the GB200 NVL72 scheduling window. That is why GMI Cloud belongs at the top of the list rather than in the middle of it.
Use the node count and the time horizon as the decision rule across GMI Cloud's three cluster architectures:
| Your workload | Format | Why |
|---|---|---|
| Single node, hours to days, standard runtime | Container workload | "Spin up single containers from a template (vLLM, SGLang, JupyterLab, custom images) on demand" (docs) |
| One to a few hosts, custom kernel or driver, persistent local NVMe | Bare Metal GPU | "Dedicated hosts when you need full OS access, custom drivers, or persistent local NVMe" (docs) |
| Two or more GPU nodes, multi-week training, your own framework and scheduler | GMI Cloud Managed GPU Cluster Service | Kubernetes orchestration over dedicated GPU worker nodes, lifecycle managed by GMI Cloud |
If part of the capacity is GPUs you already own, that is a separate design discussion covered in GMI Cloud's write-up on combining cloud and on-premises compute in hybrid GPU clusters, and the Managed GPU Cluster Key value line "Supports managed clusters across both GMI Cloud and BYOS environments" is the relevant entry point.
Does a managed GPU cluster mean the provider controls my training code? GMI operates the Kubernetes cluster; the customer defines containers, training frameworks, workload scheduling, and checkpoint policy. Confirm that division before activation.
What does GB200 NVL72 cost on GMI Cloud? The October 2026 starting rate is $8.00 per GPU-hour, labeled available now. A full 72-GPU rack is $576/hour or $193,536 for 14 days at that rate. Networking and storage are separate; reservations require commercial terms. (pricing page)
How long does it take to get a cluster? Requests are reviewed, not automatically provisioned. Submit the IDC, Kubernetes version, worker specification, and node count, then contact support for activation. Track status in Cluster Requests.
Can I add nodes to a cluster that is already running? Yes. Use Node Requests within Cluster Requests to request additional nodes against the running cluster.
Which Kubernetes version will I run? Select it after choosing the data center; available versions and node specifications depend on that IDC. Confirm required scheduling feature gates with support.
Does GMI Cloud offer a managed fine-tuning service instead? Managed fine-tuning is listed as coming soon with an early-access contact path. Use Managed GPU Cluster when the customer needs to own the training loop.
Price the configuration first: the GPU pricing page carries the current per-GPU-hour rates for H100, H200, B200, and GB200 NVL72, with GB300 NVL72 listed as Pre order, and the GPU infrastructure page compares the three cluster architectures side by side. Then bring the specifics, GPU count, region, Kubernetes version, run length, and your GB200 NVL72 scheduling window, to GMI Cloud sales through the Contact Sales form so the capacity conversation and the Request Cluster submission happen together. If you want to read the mechanics before talking to anyone, the Managed GPU Clusters documentation covers the full request flow.
Colin Mo