November 01, 2026
A GB300 NVL72 rack holds 72 Blackwell Ultra GPUs and 36 Grace CPUs across 18 compute trays, and each tray carries four GPUs, two Grace CPUs, its own memory, network adapters, and local drives. Because those resources come packaged together, a smaller allocation reads most clearly in tray units, with each resource stated as a number in the pilot quote: the GPUs and their NVLink partition, the Grace cores and host memory, the scale-out and storage network paths, and local and persistent storage. GMI Cloud takes GB300 NVL72 pre-orders through our sales team for long-context, high-capacity training and large-scale reasoning, and the lines below are what that conversation should settle. Every GPU allocation on GMI Cloud is single-tenant and dedicated to one customer.
A GPU count alone doesn't show whether the pilot can run the tests you care about. Two trays in one NVLink partition and two trays in separate partitions have the same eight GPUs, yet only the first lets a parallel group span all eight over NVLink. Scale-out ports work the same way: a multi-node test measures RDMA performance only when those ports reach an RDMA fabric. Otherwise NCCL can fall back to slower transports such as IP sockets, and the numbers stop describing the production setup.
NVIDIA's enterprise reference architecture for NVL72 AI factories describes the GB300 NVL72 compute tray, and the GB300 NVL72 product page gives the rack totals. The two-tray column doubles the tray figures, and the full-rack column lists NVIDIA's rack totals.
| Resource | Per compute tray | Two trays (8 GPUs) | Full rack (18 trays) |
|---|---|---|---|
| Blackwell Ultra GPUs | 4 | 8 | 72 |
| GPU memory (HBM) | 1,152 GB, or 288 GB per GPU | 2,304 GB | 20 TB |
| Grace CPUs | 2 | 4 | 36 |
| Arm Neoverse V2 cores | 144 | 288 | 2,592 |
| CPU memory | About 1 TB | About 2 TB | 17 TB |
| ConnectX-8 adapters, east-west | 4, one per GPU | 8 | 72 |
| Local NVMe | 1 M.2 boot drive, 4 E1.S drives | 2 and 8 | 18 and 72 |
NVIDIA lists 800 Gb/s of network connectivity per GPU through the ConnectX-8 SuperNIC, and the reference architecture describes the E1.S drives as a fast local cache. A quote that names only "8 GPUs" leaves the CPU, memory, network, and storage lines to assumption.
The GPU section of the quote should answer four things.
Model state usually sets the tray count. Assume a model whose FP8 weights take 1.4 TB, kept fully resident in HBM and sharded evenly across the GPUs. One tray's 1,152 GB can't hold them. Two trays in one partition give 2,304 GB, which leaves about 900 GB, or roughly 113 GB per GPU, for KV cache, activations, and runtime overhead before concurrency is added. Whether that is enough depends on the runtime, context length, and batch size the pilot targets.
Quotes for GPU capacity often say little about the CPU side, yet a GB300 NVL72 tray brings 144 Arm cores and about 1 TB of CPU memory with its four GPUs. NVIDIA counts the rack's HBM and CPU memory together as 37 TB of fast memory, which places host memory inside the system design.
Confirm three things here:
NVLink, inside the partition. NVIDIA rates the full rack at 130 TB/s of NVLink bandwidth across all 72 GPUs, through nine NVLink Switch trays. A smaller allocation reaches only the GPUs in its own partition, so the line item is partition membership. An NVLink all-reduce across the partition on the first pilot day records a baseline for that GPU set and message size.
East-west scale-out, through ConnectX-8. Each GPU has its own ConnectX-8 adapter. These ports carry traffic that leaves the NVLink partition, and an RDMA test runs over them. The quote should say whether the ports in your allocation are connected to an RDMA fabric and which other trays or nodes they can reach. GMI's GPU infrastructure runs RDMA-ready networking for high-throughput workloads.
North-south, through BlueField-3. BlueField-3 DPUs carry storage, data ingest, and external traffic for the trays. The quote should name the storage tier the pilot reads from and writes to and which networks can reach it. GMI runs isolated VPC networking, so the subnets and storage endpoints inside the pilot's VPC can be listed by name.
Storage gets its own lines too. Local E1.S drives handle scratch and cache, and datasets and checkpoints sit on a persistent tier whose capacity and retention after the pilot ends belong next to the tray lines.
Read the quote backward from the tests you plan. A missing line shows up as a test that can't run as intended.
| Pilot test | Resource it depends on | What the allocation needs |
|---|---|---|
| Model fits and serves on GB300 memory | HBM across the GPUs holding the model | Enough GPUs for sharded weights plus runtime headroom |
| Tensor- or expert-parallel group above four GPUs over NVLink | NVLink partition | Every GPU in that group in the same partition |
| Cross-partition training step at RDMA bandwidth | ConnectX-8 scale-out ports | Ports connected to an RDMA fabric across the trays in the test |
| Input pipeline throughput | Grace cores and host memory | Full core and memory allotment, or stated limits |
| Checkpoint save and restore time | North-south path and storage | Named storage tier, capacity, and path matching production |
| Software bring-up on Arm hosts | One tray | Access level, OS image, and aarch64 container builds |
| Operational handling of a fault | Support terms | Support scope and SLA terms written into the quote |
The values below are a worked example for a two-tray inference pilot, not a standard offer.
Plan for weights and the active KV cache to sit in HBM, and treat host memory as the tier for pinned data-loading buffers, checkpoint staging, and KV-cache offload where your serving runtime supports it. Offload works differently from one runtime to the next: some use host memory to keep reusable prefixes close at hand, which raises cache hit rates rather than the context a single request can hold. Run the pilot with offload on and off at your target context length and compare latency and throughput, so the full-rack plan counts host memory only for the gain you measured.
That depends on the size of the model files against the usable capacity of the four E1.S drives per tray. When the files fit with room left for scratch data, a short inference pilot that loads one model can run from local disk. A checkpoint-time test tells you the most when it writes to the same kind of persistent storage the full rack will use.
Send us the model size and precision, the largest parallel group your jobs use, the pilot tests you plan to run, and the storage each test needs. Those four inputs map directly onto the tray, partition, network, and storage lines above. NVIDIA H100 and H200 are available now for preparation work, such as data pipelines and storage layout, that can start before Blackwell delivery. Talk to our sales team about the GB300 NVL72 pre-order.
Colin Mo
GMI Cloud helps you architect, deploy, optimize, and scale your AI strategies