November 01, 2026
The first field in a Blackwell RFQ should describe the workload and the metric that proves the capacity works, before any GPU model appears: the model, its precision, the job type, and a number such as step time or p95 latency that every bidder has to size against. After that come hardware counts in stated units, network and storage in stated units, managed scope and support, and a response sheet every bidder fills in the same way. A provider is worth shortlisting for like-for-like quotes when it can answer each of those fields as a separate line. On GMI Cloud GPU infrastructure, every GPU is dedicated and single-tenant and priced per GPU-hour, a unit the rest of the form can be converted into.
At GMI, the Blackwell rows of such an RFQ cover B200 worker nodes for managed clusters, B300 as a hardware option for Prime Inference, and GB200 NVL72 and GB300 NVL72 racks, all in pre-order today, while H100 and H200 are available now.
Bidders size capacity from whatever the RFQ gives them, so give them a workload and a target rather than a GPU count. Put these fields at the top of the form, each with the unit you expect back:
| Field | Unit or format | Common mis-fill |
|---|---|---|
| Job type | Training, fine-tuning, or inference, one lot per type | Mixing lots, so bidders size for the larger job |
| Model and size | Name, total parameters, active parameters for MoE | Total parameters only, for a mixture-of-experts model |
| Precision | BF16, FP8, or FP4, for weights and KV cache or optimizer state | Left blank, so each bidder assumes its own memory footprint per parameter |
| Sequence length | Tokens, as p50 and p95 of real traffic | Only the maximum context, which inflates memory sizing |
| Throughput target | Tokens per second or step time at a stated global batch; requests per second at stated input and output tokens | "As fast as possible," or a GPU count |
| Latency target | p95 time to first token and p95 end-to-end, in ms, at a named concurrency | Average latency |
| Parallelism plan | Tensor, pipeline, data, and expert degrees, if fixed in code | Omitted when the code assumes a specific NVLink domain size |
Then write the acceptance metric as a test a bidder could run on the allocation it proposes. A training version might read: sustain [N] tokens per second on [model] at BF16, global batch [B], 8K sequence length, across the full allocation for two hours. An inference version: complete [R] requests per second for one hour at 2,000 input and 500 output tokens and [C] concurrent requests, with p95 time to first token under [T] ms and p95 end-to-end under [E] ms. Ask every bidder to name the system and GPU count it would use to pass that test. Each quote becomes a sizing claim tied to your workload, and claims built on different hardware can still be compared.
Blackwell capacity is sold in units that don't share a denominator. NVIDIA's HGX B200 and HGX B300 platforms carry eight GPUs per baseboard. NVIDIA describes the GB200 Grace Blackwell Superchip as two Blackwell GPUs paired with one Grace CPU, and a GB200 NVL72 rack as 36 Grace CPUs and 72 Blackwell GPUs in one NVLink domain. Quotes per node-hour, per superchip-hour, and per rack-hour can all be correct and still describe three different GPU counts. Each hardware row should ask for:
Two mis-fills recur here. "One NVL72" with no word on partial racks gets answers in different shapes. A blank memory field makes a B300 bid and a B200 bid look like one product at two prices, even though the two GPUs carry different amounts of HBM and hold different model sizes per GPU.
Attach a response sheet with one row per RFQ field and fixed columns, and accept nothing else as the technical answer. Prices go on a separate tab keyed to the same field numbers, so the technical comparison is finished before anyone looks at a rate. The rows below are illustrative values, not a quote:
Field Requested Quoted Unit Status Deviation / assumption
1.8 GPUs to pass the test - 64 GPUs - HGX B200, 8 nodes, passes test
2.3 GPUs per billing unit - 8 GPUs per node - -
3.1 Scale-out bandwidth 400 400 Gb/s per GPU included RDMA over Ethernet
3.2 Shared storage 500 500 TB usable separate line parallel file system
4.2 Node image patching provider customer - not offered customer builds images
The first row is where a bidder commits its sizing to your acceptance test, and every other row describes the allocation behind that number. A few rules keep the sheet honest:
Delivery dates, minimum commitments, and capacity guarantees go on a tab of their own, since weighing them takes a timeline comparison rather than a column.
Work through mismatched answers in a fixed order:
For cluster lots, Managed GPU Cluster (early access) provides fully managed, Kubernetes-based clusters with H200 or B200 worker nodes, provisioned and operated by GMI. The request form described in the Managed GPU Clusters documentation captures billing method, data center, Kubernetes version, worker node specification, node quantity, and OS image, which map directly onto the hardware and managed-scope fields.
For inference lots, Prime Inference runs your model on reserved single-tenant GPUs with runtimes our engineers tune per model, and B300 is one of its hardware options. Its quotes are tailored to the model and traffic profile, the same details your workload block already spells out.
It works best as two lots in one document. Training lots are sized on step time or tokens per second across the allocation, and inference lots on requests per second at a p95 latency, so a single acceptance test can't serve both. Separate lots also let you award each one to a different provider.
Holding it back in the first round keeps bidders sizing to the workload instead of to a number. Once the technical sheets are scored, sharing a budget range with the shortlist opens the commercial levers, such as a longer commitment term or a different payment schedule, along with alternative systems that still meet your throughput and latency targets.
Send the workload fields and acceptance metric to our team and ask for the answer in your response-sheet format. Include the lots, GPU counts, and storage and egress assumptions you're giving every other bidder, so our configuration and line items sit in the same columns as theirs.